Electro-hydrometallurgical chloride process for selective gold recovery from refractory telluride gold ores: A mini-pilot study
Loading...
Access rights
openAccess
Journal Title
Journal ISSN
Volume Title
A1 Alkuperäisartikkeli tieteellisessä aikakauslehdessä
This publication is imported from Aalto University research portal.
View publication in the Research portal
View/Open full text file from the Research portal
Other link related to publication
View publication in the Research portal
View/Open full text file from the Research portal
Other link related to publication
Date
2022-02-01
Major/Subject
Mcode
Degree programme
Language
en
Pages
11
Series
Chemical Engineering Journal, Volume 429
Abstract
The current paper introduces for the very first time recently invented electrodeposition-redox replacement (EDRR) method in continuous leaching-recovery-solution purification process. The mini-pilot study reveals that longer duration of the EDRR process is beneficial as it increases gold recovery per stage and decreases the specific energy consumption of the EDRR. This extraordinary behavior is postulated to be inherent to the EDRR process, as during the EDRR the cathode surface is gradually transformed from stainless steel surface to gold(±copper) surface, thus increasing process performance with time. In addition, gold concentration of 1 mg/L in the PLS was established as the minimum concentration required for efficient operation of the EDRR process. Gold extraction from ore to solution throughout the pilot test reached up to ca. 90%, whereas in reference cyanidation test only 64% of gold was dissolved. Overall, after 150 h of pilot experiment, 83% of dissolved gold was recovered from solution on the cathode, resulting in 68.5% holistic recovery of gold from ore. Furthermore, process simulation model was built, and it suggested that closed-loop operation of cupric chloride leaching – EDRR recovery – copper precipitation process can recover in total over 84% of gold from refractory telluride ore to the cathode product, providing further evidence of true potential of EDRR in sustainable gold extraction.Description
| openaire: EC/H2020/721385/EU//SOCRATES
Keywords
Pilot plant, Cyanide-free leaching, electrodeposition-redox replacement, EDRR, HSC Chemistry
Other note
Citation
Korolev, I, Altinkaya, P, Haapalainen, M, Kolehmainen, E, Yliniemi, K & Lundström, M 2022, ' Electro-hydrometallurgical chloride process for selective gold recovery from refractory telluride gold ores: A mini-pilot study ', Chemical Engineering Journal, vol. 429, 132283 . https://doi.org/10.1016/j.cej.2021.132283