Value-Adding Index - Share of Direct Work Included in Uninterrupted Presence Time
dc.contributor | Aalto-yliopisto | fi |
dc.contributor | Aalto University | en |
dc.contributor.author | Görsch, Christopher | en_US |
dc.contributor.author | Jianyu, Zhao | en_US |
dc.contributor.author | Seppänen, Olli | en_US |
dc.contributor.department | Department of Civil Engineering | en |
dc.contributor.groupauthor | Structures – Structural Engineering, Mechanics and Computation | en |
dc.date.accessioned | 2022-09-07T08:47:33Z | |
dc.date.available | 2022-09-07T08:47:33Z | |
dc.date.issued | 2022 | en_US |
dc.description.abstract | Continuous improvement depends on appropriate productivity measures. Productivity can be measured through time-motion studies but relies heavily on manual efforts and therefore contributes insufficiently to real-time awareness in dynamic environments such as construction. Indoor positioning shows potential determining shares of construction workers VA (Value-adding), based on Bluetooth Low Energy technology in real-time. Different studies show positive correlations between VA and productivity. However, it is unknown from location data how much workers engage in VA work while being present. Applying both methods simultaneously to one worker, this paper shows how to numerically quantify direct work (DW) and VA. Such combined data can show how much VA and DW occur when uninterrupted presence is detected while applying thresholds, indicating minimum durations spent inside work locations. Utilizing a small data sample enabled proof-of-concept testing and resulted in numerical quantifications of DW and VA. Preliminary findings show larger proportions of DW and VA when uninterrupted presence time is higher. Future research needs to enlarge the included data. If findings hold true, uninterrupted presence with higher thresholds could predict more accurate workers´ VA levels in real-time. The study also contributes to knowledge positively impacting construction by bridging workers’ behaviors on-site with monitoring technologies detecting movement | en |
dc.description.version | Peer reviewed | en |
dc.format.extent | 12 | |
dc.format.extent | 130-141 | |
dc.format.mimetype | application/pdf | en_US |
dc.identifier.citation | Görsch, C, Jianyu, Z & Seppänen, O 2022, Value-Adding Index - Share of Direct Work Included in Uninterrupted Presence Time . in Proceedings 30th Annual Conference of the International Group for Lean Construction (IGLC). Edmonton, Canada, 27-29 Jul 2022 . Annual Conference of the International Group for Lean Construction, International Group for Lean Construction (IGLC), pp. 130-141, Annual Conference of the International Group for Lean Construction, Edmonton, Alberta, Canada, 27/07/2022 . https://doi.org/10.24928/2022/0115 | en |
dc.identifier.doi | 10.24928/2022/0115 | en_US |
dc.identifier.issn | 2309-0979 | |
dc.identifier.other | PURE UUID: 8a510be8-ccdd-4e8f-b098-ed74ecabd48c | en_US |
dc.identifier.other | PURE ITEMURL: https://research.aalto.fi/en/publications/8a510be8-ccdd-4e8f-b098-ed74ecabd48c | en_US |
dc.identifier.other | PURE LINK: https://iglc.net/Proceedings | en_US |
dc.identifier.other | PURE LINK: http://www.iglc.net/papers/details/1951 | en_US |
dc.identifier.other | PURE FILEURL: https://research.aalto.fi/files/87421749/Gorsch_et_al._2022_Value_Adding_Index_Share_of_Direct_Work_Included_in_Uninterrupted_Presence_Time.pdf | en_US |
dc.identifier.uri | https://aaltodoc.aalto.fi/handle/123456789/116569 | |
dc.identifier.urn | URN:NBN:fi:aalto-202209075379 | |
dc.language.iso | en | en |
dc.relation.ispartof | Annual Conference of the International Group for Lean Construction | en |
dc.relation.ispartofseries | Proceedings 30th Annual Conference of the International Group for Lean Construction (IGLC). Edmonton, Canada, 27-29 Jul 2022 | en |
dc.relation.ispartofseries | Annual Conference of the International Group for Lean Construction | en |
dc.rights | openAccess | en |
dc.subject.keyword | time-motion study | en_US |
dc.subject.keyword | indoor-positioning | en_US |
dc.subject.keyword | continuous improvement/kaizen | en_US |
dc.subject.keyword | flow | en_US |
dc.subject.keyword | lean construction | en_US |
dc.title | Value-Adding Index - Share of Direct Work Included in Uninterrupted Presence Time | en |
dc.type | A4 Artikkeli konferenssijulkaisussa | fi |
dc.type.version | publishedVersion |