Portfolio-level investment strategy in renewing hydropower units using cost assessment by river run optimization in hydropower unit failures

dc.contributorAalto-yliopistofi
dc.contributorAalto Universityen
dc.contributor.advisorKaila, Ruth
dc.contributor.advisorRäisänen, Ilari
dc.contributor.authorMyllymäki, Mikael
dc.contributor.schoolPerustieteiden korkeakoulufi
dc.contributor.supervisorWallenius, Hannele
dc.date.accessioned2016-12-22T11:13:51Z
dc.date.available2016-12-22T11:13:51Z
dc.date.issued2016-12-14
dc.description.abstractThis thesis has the objective of developing an optimal strategy for hydropower unit renewal timing. The whole river system is considered with revenues from day-ahead, as well as intraday, balancing and frequency containment reserve markets. The problem is addressed in three steps: by determining the new optimal river run strategy in each failure, by assessing its monetary consequence and by applying this information to investment strategy. A top-down approach for modelling river systems and calculating outage losses is presented. Lost production due to spillage is the largest driver of losses, before effects on captured price. Revenues streams outside the day-ahead market are insignificant in investment decisions. Failures in single-unit plants have the largest consequences, whereas two simultaneous failures in a river are a particular concern only when they occur in the same plant. A substantial share of losses is often realized in plants that do not have the unit failure. Investment in pre-emptive renewal should be high in single-unit plants, whereas plants with a high share of revenues from non-core streams are at risk of overinvestment.en
dc.format.extent102 + 15
dc.identifier.urihttps://aaltodoc.aalto.fi/handle/123456789/23963
dc.identifier.urnURN:NBN:fi:aalto-201612226256
dc.language.isoenen
dc.programmeMaster’s Programme in Industrial Engineering and Managementfi
dc.programme.majorStrategy and Venturingfi
dc.programme.mcodeSCI3050fi
dc.rights.accesslevelclosedAccess
dc.subject.keywordhydropower optimizatioen
dc.subject.keywordriver run strategyen
dc.subject.keywordoutage lossen
dc.subject.keywordInvestment strategyen
dc.subject.keywordelectricity marketsen
dc.titlePortfolio-level investment strategy in renewing hydropower units using cost assessment by river run optimization in hydropower unit failuresen
dc.typeG2 Pro gradu, diplomityöfi
dc.type.okmG2 Pro gradu, diplomityö
dc.type.ontasotMaster's thesisen
dc.type.ontasotDiplomityöfi
dc.type.publicationmasterThesis
local.aalto.idinssi55294
local.aalto.openaccessno

Files