Relative impact of early versus late design decisions in systems development
Loading...
Access rights
openAccess
publishedVersion
URL
Journal Title
Journal ISSN
Volume Title
A1 Alkuperäisartikkeli tieteellisessä aikakauslehdessä
This publication is imported from Aalto University research portal.
View publication in the Research portal (opens in new window)
View/Open full text file from the Research portal (opens in new window)
View publication in the Research portal (opens in new window)
View/Open full text file from the Research portal (opens in new window)
Unless otherwise stated, all rights belong to the author. You may download, display and print this publication for Your own personal use. Commercial use is prohibited.
Date
Major/Subject
Mcode
Degree programme
Language
en
Pages
27
Series
Design Science, Volume 3
Abstract
To better understand the impact of early versus late design decisions, a study was undertaken on the root causes of missed requirements in new product development and their impact on development cost through rework activities. The context is the industrial development of unmanned aerial vehicles. The aim is to understand the occurrence rate of missed requirements, their root causes, and their relative impact. A quantitative approach of counting requirements changes and using engineering documentation enabled traceability from observation back to root cause origin. The development process was partitioned into sequential program segments, to categorize activities to before and after concept and design freeze. We found that there was a significant difference in the rate of design defects arising before and after concept freeze; and found there was a significantly higher number of corrective activities required for design defects arising earlier before concept freeze. The revision rate of concept phase decisions was over 50%, and the rework multiplier if detected late was over 10X. In combination, design decisions made before design freeze accounted for 86% of the total expected program cost, and 34% was determined before concept freeze. These results quantify and support the anecdotal 80-20 impact rule for design decisions.
Description
Other note
Citation
Tan, J J Y, Otto, K N & Wood, K L 2017, 'Relative impact of early versus late design decisions in systems development', Design Science, vol. 3, e12. https://doi.org/10.1017/dsj.2017.13