Findings on the Use of the Last Planner System—A Case Study

dc.contributorAalto-yliopistofi
dc.contributorAalto Universityen
dc.contributor.authorLappalainen, Eelonen_US
dc.contributor.authorAbou Ibrahim, Hishamen_US
dc.contributor.authorSeppänen, Ollien_US
dc.contributor.authorPalsola, Ilarien_US
dc.contributor.departmentDepartment of Civil Engineeringen
dc.contributor.groupauthorStructures – Structural Engineering, Mechanics and Computationen
dc.contributor.organizationOulu University of Applied Sciencesen_US
dc.date.accessioned2022-12-14T10:17:13Z
dc.date.available2022-12-14T10:17:13Z
dc.date.issued2022en_US
dc.description.abstractThe last planner system™ (LPS) is a production control method used in lean construction projects that has offered good results to construction companies in terms of improving labour productivity, increasing collaboration and the possibility for developing continuous learning. This short study contributes to LPS research on the reliability of promises and how parties perceive their effects on schedule and productivity. The study was conducted using a case study on an industrial construction project in which LPS had been in use since its start. Research data were collected using a semi-structured survey conducted online due to the pandemic. The study also utilized project progress data and measurement data from the LPS sessions. The most interesting result of the study was how little the LPS participants felt they had to compromise their goals. We also found how scheduling methods used in parallel with LPS can frustrate users and contribute to reducing its usefulness. Our findings can be used in further research in several ways, either by utilising the questionnaire we developed or by comparing our findings to other studies. We believe that practitioners using LPS will benefit from our results and can use them to address these shortcomings identified in future projects.en
dc.description.versionPeer revieweden
dc.format.extent12
dc.format.mimetypeapplication/pdfen_US
dc.identifier.citationLappalainen, E, Abou Ibrahim, H, Seppänen, O & Palsola, I 2022, Findings on the Use of the Last Planner System—A Case Study. in Proceedings of the 30th Annual Conference of the International Group for Lean Construction (IGLC30). Annual Conference of the International Group for Lean Construction, International Group for Lean Construction (IGLC), pp. 60-71, Annual Conference of the International Group for Lean Construction, Edmonton, Alberta, Canada, 27/07/2022. https://doi.org/10.24928/2022/0106en
dc.identifier.doi10.24928/2022/0106en_US
dc.identifier.issn2309-0979
dc.identifier.issn2789-0015
dc.identifier.otherPURE UUID: 6e8afe6b-3a33-4f9a-ba05-57b1f0057bb9en_US
dc.identifier.otherPURE ITEMURL: https://research.aalto.fi/en/publications/6e8afe6b-3a33-4f9a-ba05-57b1f0057bb9en_US
dc.identifier.otherPURE LINK: https://iglc.net/Proceedingsen_US
dc.identifier.otherPURE FILEURL: https://research.aalto.fi/files/94738923/Lappalainen_et_al._2022_Findings_on_the_Use_of_the_Last_Planner_Systema_Case_Study_1.pdfen_US
dc.identifier.urihttps://aaltodoc.aalto.fi/handle/123456789/118161
dc.identifier.urnURN:NBN:fi:aalto-202212146901
dc.language.isoenen
dc.relation.ispartofAnnual Conference of the International Group for Lean Constructionen
dc.relation.ispartofseriesProceedings of the 30th Annual Conference of the International Group for Lean Construction (IGLC30)en
dc.relation.ispartofseriespp. 60-71en
dc.relation.ispartofseriesAnnual Conference of the International Group for Lean Constructionen
dc.rightsopenAccessen
dc.subject.keywordLean constructionen_US
dc.subject.keywordlast planneren_US
dc.subject.keywordreliable promisesen_US
dc.titleFindings on the Use of the Last Planner System—A Case Studyen