How Does Takt Production Contribute to Trade Flow in Construction?

dc.contributorAalto-yliopistofi
dc.contributorAalto Universityen
dc.contributor.authorKujansuu, Pekkaen_US
dc.contributor.authorLehtovaara, Joonasen_US
dc.contributor.authorSalerto, Saaraen_US
dc.contributor.authorSeppänen, Ollien_US
dc.contributor.authorPeltokorpi, Anttien_US
dc.contributor.departmentDepartment of Civil Engineeringen
dc.contributor.groupauthorStructures – Structural Engineering, Mechanics and Computationen
dc.contributor.organizationSkanska Oyen_US
dc.date.accessioned2020-08-21T08:30:39Z
dc.date.available2020-08-21T08:30:39Z
dc.date.issued2020-07en_US
dc.description.abstractTakt production has gained increased attention over the past decade inside the Lean Construction community. Several case studies have shown that implementing takt has positive effects on construction production, increasing flow by decreasing various types of waste. However, evidence on how takt production actually affects the flow of trades has been contradictory. The purpose of this study is to gain a better understanding of how implementing takt production, which heavily focuses on improving the flow of processes, affects the flow of trades. This was conducted as a single case study. We collected and analyzed 650 hours of video material by observing one takt area over a period of six weeks, in addition to document observation and nine semi-structured interviews, including general contractor and trade partner personnel. We then classified and analyzed the results in light of propositions based on a literature review. Lastly, we drew our conclusions regarding what effects takt implementation has on trade flow. The observations showed that even though the beginnings of the takt production resembled the traditional firefighting way of working, this more structured method stabilized production and positively impacted trade flow.en
dc.description.versionPeer revieweden
dc.format.extent10
dc.format.mimetypeapplication/pdfen_US
dc.identifier.citationKujansuu, P, Lehtovaara, J, Salerto, S, Seppänen, O & Peltokorpi, A 2020, How Does Takt Production Contribute to Trade Flow in Construction? in 28th Annual Conference of the International Group for Lean Construction (IGLC) . Proceedings of the Annual Conference of the International Group for Lean Construction, International Group for Lean Construction (IGLC), Berkeley, CA, USA, pp. 445-454, Annual Conference of the International Group for Lean Construction, Berkeley, California, United States, 06/07/2020 . https://doi.org/10.24928/2020/0069en
dc.identifier.doi10.24928/2020/0069en_US
dc.identifier.issn2309-0979
dc.identifier.otherPURE UUID: 9fda8a22-627e-499d-88bb-f3732869510ben_US
dc.identifier.otherPURE ITEMURL: https://research.aalto.fi/en/publications/9fda8a22-627e-499d-88bb-f3732869510ben_US
dc.identifier.otherPURE LINK: http://iglc.net/Papers/Details/1800en_US
dc.identifier.otherPURE FILEURL: https://research.aalto.fi/files/44955859/Kujansuu_et_al._2020_How_Does_Takt_Production_Contribute_to_Trade_Flow_in_Construction_.pdfen_US
dc.identifier.urihttps://aaltodoc.aalto.fi/handle/123456789/45828
dc.identifier.urnURN:NBN:fi:aalto-202008214823
dc.language.isoenen
dc.relation.ispartofAnnual Conference of the International Group for Lean Constructionen
dc.relation.ispartofseries28th Annual Conference of the International Group for Lean Construction (IGLC)en
dc.relation.ispartofseriespp. 445-454en
dc.relation.ispartofseriesProceedings of the Annual Conference of the International Group for Lean Constructionen
dc.rightsopenAccessen
dc.subject.keywordflowen_US
dc.subject.keywordtakt productionen_US
dc.subject.keywordwasteen_US
dc.subject.keywordtrade flowen_US
dc.titleHow Does Takt Production Contribute to Trade Flow in Construction?en
dc.typeA4 Artikkeli konferenssijulkaisussafi
dc.type.versionpublishedVersion

Files