Achieving a 4-Hour Takt Time – and Driving Change With It
| dc.contributor | Aalto-yliopisto | fi |
| dc.contributor | Aalto University | en |
| dc.contributor.author | Riekki, Jaakko | en_US |
| dc.contributor.author | Rannisto, Jukka | en_US |
| dc.contributor.author | Lehtovaara, Joonas | en_US |
| dc.contributor.author | Seppänen, Olli | en_US |
| dc.contributor.author | Peltokorpi, Antti | en_US |
| dc.contributor.department | Department of Civil Engineering | en |
| dc.contributor.groupauthor | Performance in Building Design and Construction | en |
| dc.contributor.organization | Haahtela-rakennuttaminen Oy | en_US |
| dc.date.accessioned | 2023-11-15T08:26:03Z | |
| dc.date.available | 2023-11-15T08:26:03Z | |
| dc.date.issued | 2023-07-31 | en_US |
| dc.description.abstract | This study seeks to validate the hypothesis that takt production can be used as a driver for implementing several lean construction concepts together and for making them work as a system. This is done by studying a single case project where takt production with a 4-hour takt time was a core element of the operating system. In studying the case, a set of lean construction concepts found present in the project are extracted and analysed. It is concluded that takt production and in particular the short takt time worked to integrate the stakeholders and enabled the individual lean construction concepts to work in a tight relationship. Future case studies could be more explicitly designed to further validate the hypothesis. | en |
| dc.description.version | Peer reviewed | en |
| dc.format.extent | 12 | |
| dc.format.mimetype | application/pdf | en_US |
| dc.identifier.citation | Riekki, J, Rannisto, J, Lehtovaara, J, Seppänen, O & Peltokorpi, A 2023, Achieving a 4-Hour Takt Time – and Driving Change With It. in Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31). Annual Conference of the International Group for Lean Construction, International Group for Lean Construction (IGLC), pp. 1184-1195, Annual Conference of the International Group for Lean Construction, Lille, France, 26/06/2023. https://doi.org/10.24928/2023/0146 | en |
| dc.identifier.doi | 10.24928/2023/0146 | en_US |
| dc.identifier.issn | 2309-0979 | |
| dc.identifier.issn | 2789-0015 | |
| dc.identifier.other | PURE UUID: 18d9d715-893b-4e4f-88ed-f2da8e618c06 | en_US |
| dc.identifier.other | PURE ITEMURL: https://research.aalto.fi/en/publications/18d9d715-893b-4e4f-88ed-f2da8e618c06 | en_US |
| dc.identifier.other | PURE FILEURL: https://research.aalto.fi/files/127665230/Riekki_et_al._2023_-_Achieving_a_4-Hour_Takt_Time_and_Driving_Change_With_It_.pdf | en_US |
| dc.identifier.uri | https://aaltodoc.aalto.fi/handle/123456789/124451 | |
| dc.identifier.urn | URN:NBN:fi:aalto-202311156809 | |
| dc.language.iso | en | en |
| dc.relation.ispartof | Annual Conference of the International Group for Lean Construction | en |
| dc.relation.ispartofseries | Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31) | en |
| dc.relation.ispartofseries | pp. 1184-1195 | en |
| dc.relation.ispartofseries | Annual Conference of the International Group for Lean Construction | en |
| dc.rights | openAccess | en |
| dc.subject.keyword | takt production | en_US |
| dc.subject.keyword | daily management | en_US |
| dc.subject.keyword | logistics | en_US |
| dc.subject.keyword | continuous improvement | en_US |
| dc.subject.keyword | collaboration | en_US |
| dc.title | Achieving a 4-Hour Takt Time – and Driving Change With It | en |
| dc.type | A4 Artikkeli konferenssijulkaisussa | fi |
| dc.type.version | publishedVersion |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- Riekki_et_al._2023_-_Achieving_a_4-Hour_Takt_Time_and_Driving_Change_With_It_.pdf
- Size:
- 1.03 MB
- Format:
- Adobe Portable Document Format